ChIP-Seq Histone modification time span study
1
0
Entering edit mode
10.1 years ago

I am analysing ChIP-seq data for histone protein.

The study is timeline study. It aims to study the binding pattern of histone at different time points(0hr, 2hr, 4hr, 5hr, 6hr). We have two strains namely virulent and avirulent for the time points (2hr, 4hr, 5hr, 6hr) and 0hr sample is common.

I have a few questions about analysis listed below:

  1. I am doing peak calling with help of MACS2. What are the parameters to be consider for peak calling?
  2. I don't have Input and mock, should I use one of my sample as control during macs2 peak calling or I do peak calling step without control
  3. What should be the minimum number of peaks discover in histone study?
ChIP-Seq • 2.8k views
ADD COMMENT
0
Entering edit mode
10.1 years ago
Manvendra Singh ★ 2.2k

1) in -f you specify if your allignment is in bam format or sam format, -g specify the genome which you are mapping (e.g. hs for Human)

-n specify the names of output, -q is FDR threshold, I also give -B, where I also get bedGraph file of peaks, its convenient for some statistical tests. -t is treat, oc is control

-f <SAM/BAM> -g <hs> -n <names> -q <0.05> -B

2) I would suggest you to always call peaks taking Input as control, for Histones and mock as well., Later compare Histones with mock to see the relative enrichment against mock.

3) It depends, See how many you get first.

ADD COMMENT
0
Entering edit mode

Manu, Thanks for reply

In some research paper suggested that if you are studying time span study then call peak without using control

ADD REPLY

Login before adding your answer.

Traffic: 1945 users visited in the last hour
Help About
FAQ
Access RSS
API
Stats

Use of this site constitutes acceptance of our User Agreement and Privacy Policy.

Powered by the version 2.3.6